Saturday, March 26, 2016

2nd Week in Taft, TX




As we begin the week, we finish some items that were begun last week.   Before the Day Care day starts, Jodi removes painter's tape from the door she painted last week.
And Stel reinstalls the hardware to that same door.

The sign for the Resale Shop gets finished by Sharon and Carol and the plexiglass has been  secured to cover the sign,

and with the help of Dave, the sign is hung on the shop.

Mike and Stel work to complete the ramp they started last week

and this is the final product.
This week, Duane, Wilma and Gene were also able to finish this ramp
which is quite long.
Back at Taft First UMC, the sign that was cleaned last week gets a new coat of white paint.
Carol, Wilma and Sharon are replacing damaged tiles in the nursery
and one of the classrooms in Day Care.

Dave has patched a large hole in the floor under the sink in the custodial closet and is now adding tile to the new floor
and Dave uses a special "clamp" (Sharon) to hold the tile he is attempting to cut.
Stel begins a new project to make screens for the Day Care windows so that the kids can get some fresh air. (Without screens, the mosquitos in this part of Texas would carry the kids away.)
The pneumatic nailer sure aids the construction.

Jodi applies a coat of primer and paint to the screen frames.
Since they cant get into the classrooms when the kids are present, Carol and Wilma help Jodi by sweeping the construction sawdust from the garage.
Then Carol and Sharon fill in between jobs by painting some larger screen frames for the nurse's office to keep out some of the sun and help cool the office.
On their way to clean their paint tools, Sharon and Carol stop to visit.
Stel and Jodi who are attaching hardware to previous screens and 
fitting them to the appropriate window before the screening is attached.
Carol, Sharon and Dave are trying to clean the kitchen between meal prep time at Day Care but they can't see very well so Stel is replacing light bulbs to shed some more light on the subject.
With more light, Dave attacks the gease above the stove,
with the help of Sharon.

Carol cleans counters and lower cabinets.
Dave, Sharon and Carol make a great cleaning crew but

they are all too short to reach the area above the stove so Stel lends a hand.
Even the step stool gets a cleanup.


We were asked to repair this lady's porch so Mike, Gene and Duane have torn off a  6x9 foot section and
removing the old support plate with the help of Gene
and Mike.
Duane prepares to install a new stringer.

A day later, Wilma has joined the effort and they are making great progress.
On Thursday, while Gene and Mike are investigating another possible project, Wilma and Duane are adding the finishing touches.
and as the week closes, this lady has a new, much safer porch.
As the week ends, Gene meets with Pastor Cliff to evaluate completed projects and to line up additonal work for next week
One night, we had dinner at the home of two members of the Taft UMC, Ray (seated on the sofa) and Jo (standing).  They live in a development on the water at Port Aransas, about 1/2 hour east of Taft.
Pastor Cliff and his wife  were co-hosts and it was a lovely evening,
and a lovely drive home.  A good ending of the week.

No comments:

Post a Comment