On Saturday, we welcomed a new rig.

Our team for this week  are from the left, Lee Ann, Barre, Stel, Jodi, Suzanne, Mary, Ron, Ann & Max.

As we begin the new week, Ron and Barre begin removing the rest of the siding from the original structure so we can make the doorway and finish tying the two rooms together.

Then they add hangers  and 

Barre and Max began installing purlins to attach the metal roof.

Meanwhile, Stel and Ron began framing the rough opening between buildings and framing the closet and bath in bedroom #2.

Its all hands on deck to install the sub-facia and hold the ladders.

Finally we are ready to install roofing on Bedroom 2.

The roofing crew.  Below for cutting, marking screw locations and moving the sheets of metal up to the roof and to hold ladders.  Those on the roof install the sheets.

About 2/3 of the roof is finished.

Meanwhile, crews take a break to set up scaffolding for the siding crew

and it takes nearly everyone to set it up.

The siding crew back in business and hard at work.

With most of the roof complete, it is time to close up for the week.
Since Max and Anne (right) are leaving as leaders, they get a farewell picture with homeowners Richard and Sandy.