Sunday, March 9, 2014

Bastrop, Texas - Disaster Recovery Project

We had 11 team members on our first week in Bastrop.  Left to right are Nancy and Woody, Jodi & Stel, Sara, Virgie and Dan, Nula & Dan and Lerene and Cliff. 

We all worked on the same house, Archie and his wife  lost there home in a fire.  He and some friends built a replacement shell but then he lost heart.  He is a "handy man" who is also going to school to become a minister.  NOMADS have been working at this house for a while putting on siding, skirting, drywall and skirting, flooring, kitchen cabinets, etc.  When we arrived, we finished building the front deck and built a new deck in the rear.
Dan and Stel building the railing on the front deck.
Sara ran the saw cutting the pieces for us.
 Nula attaching the railing on the steps.
Dan on the left directing the cuts for the steps and railing there.
Finishing touches on the deck railing - sanding.
 
 Hanging doors...
and shelves.
Virgie caulked all the exterior seams.
Cliff and Lerene built closet and pantry shelves.
And Woody helped with the installation.
Nancy helped with painting the shelves, doors and trim.
And so did Jodi.
Dan, Virgie and Woody installed the new  microwave.
Dan, Stel and Virgie laid laminate in the "occupied" bedroom.
Dan and Nula installed the countertop in the kitchen under the direction of leader Dan.

There were nine of us on the second week.  Eldon and Linda (3&4 from the left) replaced  Woody & Nancy and Dan & Virgie headed home after 4 weeks of leadership.  Cliff and Lerene are the new leaders (3&4 from the right). 

There was more painting of trim and doors,

and the walls and ceiling in the LR

More door hanging for Cliff and Lerene...
 and for Eldon ...
and Stel
Nula installing backer board for the tile in the entryway.
and Dan assisting with the tile installation.
Since the plumbing has not been installed, we HOPE that Sara is caulking the trim and vanity we previously installed.
At various times, Cliff, Dan, Stel & Eldon installed baffles and insulation in the attic.  All wondered not so secretly why this was not done BEFORE the drywall was installed.


Linda....
 Lerene...
 and Nula, along with Jodi & Stel, preparation the floor for laminate.
Sara adding caulk to the backsplash of the countertop.
Dan and Stel installing the laminate in LR with Sara (hanging outside the window) supply the cuts.
"Disaster" Dan on the right is in charge of the Bastrop disaster projects.  He and his wife lost everything but the clothes on their backs and 2 years later, he still tears up saying "I thought I was over this."  It is important that Cliff takes time to listen to Dan's story.
This keeps us coming back and we will be back next week.