Sunday, March 11, 2018

Final Week in Fentress, TX

As we begin our final week, we finally were able to get a group picture of our team.

From the left are Jodi, Stel, Steve, Sandy and Steve

We headed back to Lupe's house and again tackled the roof.

After a productive morning, we hoisted and installed the final panel .

Remaining tasks include installing ridge vent, end caps and miscellaneous trim.

Final touches include reinstalling these decorative posts in front,

and our work is complete in front
and in the rear.

Then we headed back to the church for a few chores there including pruning shrubs

major trimming of bushes,

gathering debris

and major prunning of trees.
That was a lot of work.

There was inside work including repairing sanctuary lights, installing lights in new areas and general cleaning of floors

and windows and

repairing door latches.
After work, Jodi, Imoto and Stel visited with the neighborhood goats and their kids.
and it looks like Imoto has made new friends.
Our project is finished and we head off for a week of rest before our project in Baton Rouge, La