We have returned to Hot Springs, Arkansas to continue work on the floors of the cabins. |
We have a larger crew this trip with 5 rigs present on weeks 1 and 3. There was a death in the family of one couple so they were absent on week 2 only. |
As in the previous trip, we tore up tile and subfloor from 6 rooms in 3 cabins. |
Then comes the cleanup. |
Thank goodness we had this magnet for Joe to clean up those thousands of nail debris. |
After tearout, we installed new 3/4 inch subfloor and put installed thousands of screws to hold it down. |
Next came installation of tile with Linda and Jayne on this team, |
Stel and Jo installing also, |
as are Lisa and Mark. |
The trim had to be painted so Joe finds a sunny spot to do so |
but rain forced Joe and Lisa to work on one of the porches. |
There were leak spots noted in 2 cabins so the crew assessed the problem and installed additional flashing |
In another area, the loovers in this roof vent had been damaged by weather and or animals so Mark climbed up to do tear out and asses materials needed. |
At the end of the project, we installed new baseboard and trim to finish |
and make new thresholds for each exterrior doorway |
and installed them. |
Some learned new skills like Joe who learned how to operate the tractor to move the debris to the dumpster. |
And in the end, we had a chance to inspect each others work in this beautiful campground. |
These buzzards overlooking our campsite are looking way too interested in US so it may be time to move on. |