| Here we are in Arkansas at this UMC Camp to help with maintenance & repair. |
| It's a beautiful drive into the camp |
| and a beautiful lakeside campground. |
| This is the Administration building, |
| some of the cabins and swings (the latter built by former NOMADS teams) |
| and our campground. |
| and this is our crew. From the left front, Jerrel, Linda, Jay and Beth with Stel and Jodi in the rear. |
| We are currently working in two cabins. |
| The tile are coming loose and the subfloor is buckled. We are all working in the same area. |
| Stel is removing tile, |
| as is Jerrel |
| and Jay |
| and Jodi. |
| Beth , Jodi and Linda carry out the debris. |
| Thlen Jerrel cut the OSB in small pieces |
| Stel & Jay pry up the OSB while Linda tries to contain the debris. |
| One room had plywood subfloor that had warped. It is removed and put into the truck to haul to the dumpster. |
| Levelling the floor for new plywood. |
| Jay and Beth measuring for plywood sheets. |
| Jay and Jerrel cutting new plywood and putting it in place. |
| Jerrel, Stel & Linda attaching the plywood with deck screws. |
| Jodi learning to use the driver to add screws as well. |
| Beth and Linda fill the cracks with compound. |
| Stel finally gets the last screw into the plywood but can she get up after 4 days? |
| Stel sands joints to remove ridges. |
| Beth and Jodi clean the floor for vinyl. |
| 2 rooms have plywood so now Jay, Stel, Linda and Jerrel start installing the "click" vinyl sheeting. |
| Next day, Stel and Beth and Jay are nearing the final wall in this room. |
| Jerrel busy cutting addtional spacers to keep vinyl tile away from the wall. |
| The Camp directors visit at the end of the first week to see how we are doing. |
| As one room is finally finished, |
| On Wednesday of week 2, some local NOMADS bring us lunch and we share the meal with full time campground staff. |
| It's time to rest before these guys decide we're their lunch. |
