Some reorganized the store area, some cleaned out storage areas, and some built a cover over the rear dock area to protect donated items as they are dropped off. The proud contractors are (from left to right) Pat, Kathy, Mike, Ruthie and Stel.
Linda and Chic reorganizing the stock. This proved to be a week long project for 6-8 team members
Pat, Ruthie and Kathy in the storage area
Linda emptying shelves in attic storage
A chain gang ready to receive disposable items from the attic storage to the dumpster. Joan, Linda, Kathy and Ruthie with Jodi taking the pictures.
On Tuesday, we began to repair and opening in the Church Tabernacle just behind our camping area.
Jim, Stel, Pat and Gary prepared the opening while Mike went shopping for the supplies needed to close in the opening.
Pat and Gary cut the insulation while Mike and Stel stuffed it in the opening.
Jodi doing a little mid project cleanup.
Jim, Stel, Gary, Pat and Mike close up the opening by putting new panels underneath the old. The new panels were not long enough to replace the paneling all the way to the roof line. We finished this job before lunch so it was on the remodel the barbeque shed in front of the tabernacle.
We tore out the old half wall
and built new framing
next day, we tore out the side "half walls" and built new framing for doorways and wall coverings.
That ended the week. As you can tell, it is still unusually cold for Florida, but things are looking up for the weekend.
No comments:
Post a Comment