| As the second week begins, Bub finishes the plumbing in the education building by caulking the fixtures |
| and Avis begins reinstalling the refinished cabinet doors. |
| Midge and Barb continue sanding doors and cabinets |
| and Stel helps Midge by removing hardware. |
| Barb applies polyeurothene to the cabinets. |
| Denny and Gary patched holes in the drywall in the Thrift Shop |
| and applied mud to the seams. |
| Cindy and Jack finish rebuilding the porch roof. |
| Avis sorted through paint to find usable material to paint the playground equipment. |
| Midge paints some missing cabinet doors we found in storage. |
| Bub and Steve install 2 used fans in the Thrift Shop. |
| Jack and Cindy installed new vinyl base in the Education Building. |
| Denny began sanding the swing set |
| with the assistance of Gary. |
| Avis painted the concrete slab while Cindy and Stel take a break fron the work and |
| Gary takes a brief rest. |
| Bub tries to make these old light parts into a working fixture for the Thrift Shop and |
| his work was successful. |
| Stel helps Avis prepare these porch posts for painting and |
| Gary begins the painting process. |
| Those tree stumps have to go so Stel begins to dig around them and |
| Gary lends a hand. |
| Stel was able to cut off most of them but this one was a big problem. |
| Afterward, Jodi helps to refill the holes. |
| Avis replaces damaged floor tile and baseboard in the men's room and |
| the ladies room as well. |
| The Pastor wanted 2 gates installed on both ends of the choir loft to limit weekday traffic so Steve, Denny and Bub begin the design process. |
| and Bub and Steve begin the construction. |
| Cindy installs new door stops. |
| The first of the refinished doors is dry so Steve, Stel and Avis rehang it while |
| Steve and Bub began removing the sanctuary doors for refinishing and |
| 4 people are needed to carry them so Steve, Bub, Denny and Stel each grab a corner |
| and Cindy preps by taping the glass. |
| Avis repaints an exterrior door of the Ed. building to make it more "kid friendly". |
| Denny and Gary begin repairing @ 200 chairs for the sanctuary by adding screws and wood putty. |
| Steve and Bub design security bars for the restroom windows and install them, but |
| They were a tad "ugly" so Avis begins covering them with paint |
| and Bub reinstalls them. |
| The vacuum wasn't working when they cleaned after installing the vinyl base so Cindy and Jack set out to fix it. |
| The door locks to the sanctuary were giving everyone trouble so Steve begins to assess the problem while Bub and Stel look on. Eventually, the locks had to be replaced. |
| Avis uses a wire brush to clean these cement vehicle stops and |
| then she repaints them. |
| Avis begins painting the bus toy in the playground while |
| Midge works on the bumble bee and duck and |
| and Cindy paints the swings |
| and Avis continues painting other playground toys. |
| Stel and Pastor Augustin meet to discuss project status and additional work to be done. |
| Midge is assigned to repaint the speed limit sign |
| and it is ready to reinstall |
| And the sun goes down on Week #2 |