Crystal River, Fla. - Week 3

To begin the week, Gary, Mike, Ruthie and Jodi went to the home of a member of Crystal River UM Church and repaired her fence by replacing posts, boards, by straightening and reinforcing collapsing walls, clearing underbrush and doing general yard cleanup.
The next day, Stel & Jodi, stained the new boards and posts, attempted cleaning up on the existing fence and scrubbed the deck and shed leading to the fenced yard.

 
The rest of the week, Mike, Ruthie, Gary & Stel finished their work on the barbeque shed at Crystal River UM Church to include finishing the doors, windows siding and soffit so that the next crew can paint it and finish some inside work.



Jim and Chic spent this week on their knees as the prepped and began installation of additional patio blocks at the church.  They got a lot done and the next crew will be able to finish it  hopefully in short order.

The rest of the crew (Joan, Linda, Pat, Kathy) with on and off help from Chic, Jodi and Ruthie, worked at the new Mission Retail Store, getting things ready to move in.  They cleaned, painted, tore out, built, wired, fixed and whatever the leadership needed for the last 2 weeks.
Friday, we all headed to Fruitland Park, Fla. for the annual Florida NOMADS Reunion Luncheon.  It was a great time meeting new folks and re-acquainting with others.

On the way back to Crystal River, we stopped at "Texas theme" entrance to The Villages.  This is quite the place.


Time to say goodbye to the team,
and to Crystal River UM Church



Wednesday, February 19, 2014

Crystal River, Fla - Week 2

In week 2, Jim, Pat and Stel travelled with Pastor David to Eustis, Fla (an hour & half drive from Crystal River) to prepare this NOMADS work storage trailer for transfer to Crystal River.  The skirt hides the fact that the previous location was on a church grounds and the folks used the underneath of the trailer for storage.
Our job was to remove all the "stuff" and remove the skirt and dismantle the stairs at the rear so that the trailer could be moved.
Finally, with more than a few prayers, the very old trailer was ready to move.
The prayers have been answered and the trailer made it safely to Crystal River.  We will not discuss the legality of all this activity.
Jim, Chic and Stel worked on resetting the trailer to be used by NOMADS teams in the future for their outreach work in this area.  Larry, in the green shirt, stood watch to approve of the efforts.
Jim and Chic putting final touches to the skirting
Jim & Stel rebuilding the steps and platform
Jodi gathering sand to set the blocks at the base of the steps
The electric was reinstalled and once the cross and flame were reattached, the trailer was again ready to go.
Meanwhile, the barbeque shed reconstruction continued.
Ruthie and Gary installing the soffit supports.
Mike assessing if the their work is level
What looked like a 4 day job is now on its second week.

But, next week is next week.

Sunday, February 2, 2014

Crystal River, Fla. Project - Week 1

On Monday, the whole crew, except Larry and Joan who had contracted a virus, went to the Nature Coast Ministries Thrift Stop to clean up, organize and repair as needed and requested.
Some reorganized the store area, some cleaned out storage areas, and some built a cover over the rear dock area to protect donated items as they are dropped off.  The proud contractors are (from left to right) Pat, Kathy, Mike, Ruthie and Stel.
Others organized the show room, sorted hangers and disposed of items no longer of use, and others repaired electrical signs, lights, fans, etc.
 Linda and Chic reorganizing the stock. This proved to be a week long project for 6-8 team members
Pat, Ruthie and Kathy in the storage area
Linda emptying shelves in attic storage
A chain gang ready to receive disposable items from the attic storage to the dumpster. Joan, Linda, Kathy and Ruthie with Jodi taking the pictures.
On Tuesday, we began to repair and opening in the Church Tabernacle just behind our camping area.
Jim, Stel, Pat and Gary prepared the opening while Mike went shopping for the supplies needed to close in the opening.
Pat and Gary cut the insulation while Mike and Stel stuffed it in the opening.
Jodi doing a little mid project cleanup.
Jim, Stel, Gary, Pat and Mike close up the opening by putting new panels underneath the old.  The new panels were not long enough to replace the paneling all the way to the roof line.  We finished this job before lunch so it was on the remodel the barbeque shed in front of the tabernacle.
We tore out the old half wall
and built new framing 
next day, we tore out the side "half walls" and built new framing for doorways and wall coverings.
That ended the week.  As you can tell, it is still unusually cold for Florida, but things are looking up for the weekend.

Sunday, January 26, 2014

Kennedy Space Center

On the way to Florida we visited an old and dear friend in Myrtle Beach, SC and moved on early enough to do a little sight seeing.  We spent a few hours at the Kennedy Space Center at Cape Canaveral, Fla.




From there, we headed west toward Crystal River, Fla and got set up with other NOMADS at our Campground on the property of Crystal River United Methodist Church.  What a beautiful location.




The church property is quite huge as this is our view of the church itself from our campground.
We have met some really wonderful people already and are looking forward to getting to work tomorrow.